A control cabinet is usually specified as an electrical assembly and shipped as a mechanical one. It leaves the panel shop clean and dry, rides a flatbed or a container for a few weeks, sits in a laydown yard or an unheated warehouse for a few months waiting on the rest of the project, and only then gets wired and energized. By the time anyone opens the door to land conductors, the terminal strips can already be dull and the relay contacts already pitted. Nothing was wrong with the build. The cabinet simply spent its first six months breathing damp, salty air with nothing inside it to stop the reaction.

Cortec® Case History #486 is a short, useful record of a company that worked this out and fixed both halves of the problem.

What Case History #486 shows

A power company in the British Isles was losing outdoor electrical control cabinets to corrosion failures, and Cortec’s published summary is specific about when the damage was occurring: during shipping, during storage, and during operation. Cabinets at coastal locations were the worst affected, which is the expected pattern once chloride-laden air gets inside an enclosure and condensation cycles start depositing it on copper, tin and plated steel. The failures were expensive for the utility and disruptive for its customers.

The fix was two products used at two different stages. The company wrapped the cabinets in VpCI®-126 Blue film for shipping and storage, and placed VpCI®-111 emitters inside the cabinets during operation. Cortec reports that this cut failure, maintenance and repair costs, and that the utility kept using the method for years afterward.

The part worth lingering on is the split. Wrapping the outside of a sealed enclosure protects it in transit and on the shelf, when the cabinet is a closed box that nobody needs to get into. An emitter inside protects it once the doors are being opened, conduit is landed and the enclosure is part of a live system. Most plants we talk to are doing one of those two things. Very few are doing both.

Why the pre-commissioning months are the gap

On a capital project the electrical gear is frequently among the first long-lead items ordered and among the last items installed. Switchgear, MCC sections, VFD cabinets and instrument panels arrive early, get offloaded, and wait. Meanwhile:

  • The enclosure is not energized, so there is no panel heater and no internal heat rise to keep the interior above dew point.
  • Shipping shrink wrap or stretch wrap is a moisture trap, not a corrosion barrier. Plain film holds condensation against the steel rather than inhibiting it.
  • Desiccant that was sized for an ocean container is long saturated by the time the unit has sat through a Midwest spring.
  • Nobody owns the asset yet. The panel builder has shipped it, the contractor has not installed it, and no preventive maintenance program covers it.

Vapor phase corrosion inhibitors suit this window because they need no power, no monitoring and no removal step. The inhibitor leaves the film or the emitter, saturates the enclosed air, and adsorbs onto every metal surface inside, including the backs of boards and the inside of conduit stubs that no coating would ever reach. When the enclosure is opened and closed again, the layer re-establishes itself.

A procedure for cabinets in transit and site storage

  1. Close the box before you wrap it. Plug unused knockouts, tape over conduit openings and latch the door. The inhibitor works by filling an enclosed volume; an open knockout vents it.
  2. Put the emitter in at the panel shop, not at the job site. Protection should start the day the cabinet is built. One VpCI-111 covers up to 11 cubic feet, which suits a typical freestanding section; a VpCI-101 covers 1 cubic foot for junction boxes and instrument housings. Write the install date on the label.
  3. Wrap the outside in VpCI-126 Blue. Tubing sized to the cabinet footprint is the fastest method for a repeating cabinet size. Roll stock or sheeting suits odd shapes and skid-mounted assemblies. Seal the seams.
  4. Keep it off the ground and out of standing water. Film stops airborne corrosion, not a pallet sitting in a puddle.
  5. Treat the interior at commissioning. When the wrap comes off and the cabinet is being wired, that is the moment to clean and coat the boards, terminals and contacts. Our post on stopping HMI control panel corrosion covers the in-service program in detail, including reapplication intervals.
  6. Replace the emitter on a schedule. Emitters are rated up to 24 months. A cabinet that waited a year for startup is already half way through its first one.

The ElectriCorr application step, on video

Cortec’s own one-minute demonstration shows the cleaning and coating step referenced above. It is worth watching before the first cabinet, mainly to see how light the application actually is.

Which products

Emitter sizing by enclosure volume, and which products are rated for enclosed as against open service, are set out in our VpCI product selection guide.

The same logic applies to any large fabricated assembly that ships with electrical gear bolted to it. When we ship a blast room, the control cabinet, the dust collector controls and the blast pot remotes all travel and wait exactly like the switchgear above, and they get the same treatment before the crate is closed.

If you have cabinets shipping this quarter or sitting in a laydown yard waiting on a startup date, tell us the enclosure count and roughly how many cubic feet each one is. We stock the emitters and VpCI-126 in Elmhurst, Illinois and can get a trial quantity out quickly. Contact Solvent Recycling Systems.

Source: Cortec Case History Spotlight #486, Preserving Electrical Control Cabinets. Emitter coverage and duration figures are from Cortec published product data.